Demolition
Published On: 17-09-2019
General Requirements Start from the top to bottom Aces and illumination will be maintained in safe way through robust inspection.. Structures Subject to Collapse Work …
Published On: 17-09-2019
General Requirements Start from the top to bottom Aces and illumination will be maintained in safe way through robust inspection.. Structures Subject to Collapse Work …
Published On: 17-09-2019
What plans for the site and surrounding area are available and show access roads, services to the site, the relationship of any pipelines to …
Published On: 17-09-2019
Surveys and Inspections Initial Survey Before starting any dismantling or demolition operations (such as structures, piping, walls, and floors), the possibility of unplanned collapse must …
Published On: 17-09-2019
What is Demolition Plan? A written plan outlining the specific sequence of events for demolition must be prepared. This plan must be approved by in …
Published On: 17-09-2019
Materials Disposition The environmental impact of the demolition material may be considerable; Environmental issues to be considered include the following: Dumping rubble or potential spillage …
Published On: 17-09-2019
Hazardous Materials Toxic insulation materials, glass, and other hazardous materials must be removed, or otherwise ensured to be safe, before the start of general structural …
Published On: 16-09-2019
Contractor Selection Criteria Site demolition generally requires the services of contractors specializing in demolition operations. Organization responsible for selecting demolition contractors must considerthe experience of …
Published On: 16-09-2019
Access The entranced to be covered and provide overhead protection. Access will extend at least 1.8 meters (6 feet) away from the structure and be …